Set Project Level Rate Class
Prerequisites
- Add the user defined rate class in the project's Rate Structure. See Add a Rate Class.
- Select in the Navigation Menu. The Manage Projects tab window displays.
- Click on the dropdown in the Ribbon Menu and select the project you want from the list.
- Select the Cost Codes tab. The list of cost codes displays in the window.
- Select the cost code row you want and click . The Edit Cost Code dialog box displays.
-
For the , uncheck the check box to enable the dropdown.
Tip:
If you want to revert back to the default rate class for the cost code, click the check box.
- Select the rate class you want to assign to the cost code from the dropdown.
- Click OK.
- Optional. Close the Manage Projects tab.